NOVEMBER 19, 2016: PROJECT UPDATES
Granite Curb
- Eastbound side of Kennedy Street from 7th St, NW to 3rd street NW.
Brick Gutters
- Georgia Ave NW to 8th street NW.
Sidewalk
- Installed brick and concrete sidewalks for the 900 and 800 blocks of Kennedy street
CPDC
- The CPDC installed tree protection, traffic control devices and erosion & sediment control for the drain inlets.
Capital Paving
- Capital Paving installed two catch basins at 9th St NW intersection
- Installed a new manhole with a drain pipe near Johnson & Jenkins Funeral Home
- New concrete driveways were installed from Illinois Ave and 7th St, also wheelchair/bicycle ramps were installed this week.
November 4, 2016: Project Updates
Granite Curb
- Eastbound side of Kennedy Street from Georgia Avenue, NW to 7th street NW
Brick Gutters
- Georgia Ave NW to 8th street NW
Sidewalk
- Installed brick sidewalk eastbound side of Kennedy street NW from Georgia Ave