OCTOBER 28, 2017

Progress:

Capitol Paving of DC (the contractor) continued the work along Kennedy Street NW between Georgia Ave NW and North Capitol Street NW. The contractor installed 157 square yards of 4 inch PCC sidewalk, 2 square yards of 6 inch PCC sidewalk and 46 square yards brick sidewalk on PCC base. Capitol Paving also continued work at 100 block for the bio-retention area and poured 5 tree boxes and supplied structural soil. Jaxson Point (Capitol Paving’s sub-contractor) performed the electrical work and installed about 220 linear feet 7 Conductor 14 AWG Stranded, about 90 linear feet of 4 Conductor 18 AWG Shielded Stranded, 21 LED module traffic lights, 7 traffic signal heads and supplied and installed 1324 linear feet of stranded wires.


OCTOBER 21, 2017

Progress:

Capitol Paving of DC (the contractor) continued the work along Kennedy Street NW between Georgia Ave NW and North Capitol Street NW. The contractor installed 7 square yards of permeable concrete pavers, 77 square yards of 4 inch PCC sidewalk, 16 square yards of 6 inch PCC sidewalk and 49 square yards brick sidewalk on PCC base. Capitol Paving also continued work at 100 block for the bio-retention area and installed four (4) new water meters, four (4) water meter housing and frames and 79 linear feet of water service pipe. Jaxson Point (Capitol Paving’s sub-contractor) performed the electrical work and installed about 212 linear feet 7 Conductor 14 AWG Stranded, about 106 linear feet of 4 Conductor 18 AWG Shielded Stranded, 8 LED module traffic lights, 2 traffic signal heads and two Video Detection Cameras. The sub-contractor (DC Line) performed pavement marking on the new pavement at the Kennedy Street and Missouri Ave from New Hampshire Ave NW to 1nd street NW intersection.


OCTOBER 7, 2017